Overview

SharonAI Holdings Q3 2026 Earnings Analysis
SHAZ · NASDAQQ3 2026AI Infrastructure · GPU Cloud
Since the Report − 3.4%
Revenue grew 1,859.7% year over year, EPS beat the estimate by 2.6%; the stock fell 7.6% in its first reaction.
- RevenueQ3
- $9.93M
- ▲ 1,860% YoY 63% Below Estimate
- EPSGAAP
- −$1.14
- Estimate −$1.17 · 2.6% Smaller Loss
Verdict
HOLDSharon AI's revenue rose roughly 20-fold in a year but came in at $9.93M, 63% below the market estimate. The loss was slightly smaller than expected, yet the stock fell 10.8% in the session and 7.6% after hours. The only question now is how fast a $9.6B contract book turns into billing.
Close on Report DayNov 16
$20.13▼ 7.6%Report-Day Move
- Market Cap(Today)
- ≈ $696 M
Earnings Summary
In 30 Seconds- Revenue of $9.93M rose roughly 20-fold year over year but came in 63% below the consensus estimate.
- Total contract value reached $9.6B, and the company expects ARR to reach $400-450M in January 2027.
- The stock fell 10.8% in the session and 7.6% after hours as the market questioned how fast contracts turn into billing.
The Numbers
Net Loss
$43.8M
Year Ago $1.6M
Total Contract Value
~$9.6B
Over 5.5 Years · +$2.5B Since Q2
After-Hours Reaction
−7.6%
After Hours · Nov 16 Close $20.13
Cash
$1.34B
$71M in December 2025
Quarterly Revenue ($ Million)
0.51
Q3 25 · $507 K
0.36
Q4 25 · $358 K · QoQ − 29.4%
0.29
Q1 26 · $294 K · QoQ − 17.8%
1.93
Q2 26 · $1.93 M · QoQ + 556.9%
9.93
Q3 26 · $9.93 M · QoQ + 414.2% · YoY + 1,859.7%
- Q3 25
- Q4 25
- Q1 26
- Q2 26
- Q3 26
Q4 2026 Company Guidance
- Annual Revenue Run-Rate (Jan 2027)400 – 450 million400 million450 million
September 2026 Level $50M · No Market Estimate8-9x September Level ▲
- Capacity to Bill (Jan 2027)30 MW
Part of 129 MW Contracted Capacity23% of Contracted
- Total Capacity (2027)212 MW
155 MW Available for Sale · 80 MW Added in Q373% Available for Sale
How to Read the Chart
The blue band is the company's low-high range; its length shows how much room the company left itself. The black triangle and the line beneath it mark where the market expected, and the notch in the band is the range's midpoint. The triangle appears only where a market expectation is known. When the company gave a single number rather than a range and no market expectation is known, that row gets no band at all: there is no length to measure and no position to compare. Axis is ±6.8% around the midpoint.
Company-Specific Metrics
Total Contract Value
$9.60 B
Press Release
ARR (September)
$50.0 M
Press Release
Contracted Capacity
129 MW
Press Release
2027 Total Capacity
212 MW
Press Release
Cash and Equivalents
$1.34 B
10-Q
Customer Deposits
$800 M
Press Release
Metrics come only from the company's own filings; each one names the document it was taken from.
“In the third quarter, we advanced the conversion of our contracted commitments into live AI infrastructure at scale. Globally, demand for AI compute is outpacing the power available to deliver it.”
- From Contracts to Live Infrastructure
- Power Lags Demand
- Long-term Pricing Strengthens
Summary and Review
Summary
Sharon AI reported third-quarter revenue of $9.93M, roughly 20 times the year-ago level. The year-ago quarter was $0.51M, and revenue rose 414% from the second quarter. The consensus estimate was $26.94M, so the revenue gate is closed by 63%. GAAP loss per share was $1.14, 2.6% smaller than the $1.17 estimate. The company gives no quarterly revenue guidance, so the third gate is not counted.
The stock closed the November 16 session down 10.8% at $20.13 and fell another 7.6% after hours. The market did not read this report as a contracts story but as a delivery story. Total contract value stands at $9.6B, yet quarterly revenue is under $10M. The capacity that will be billed is still being installed and tested. Investors want to see when the promise turns into a schedule.
The score is 56 and the view is hold. The revenue gate is closed and the earnings gate is open; the decision table puts that combination in the 55-69 band. Three concerns keep the score near the low end: a $43.8M net loss, $66M of operating cash outflow in the quarter and an unproven delivery schedule. The $1.34B of cash on the balance sheet reduces near-term funding risk. Analyst targets were set before the report and are expected to be revised.
Full Review
Revenue jumped but fell short of estimates.
Quarterly revenue was $9.93M. A year ago it was $0.51M, and in the second quarter it was $1.93M. Growth percentages look extreme for that reason; the base was close to zero. The real test is the gap to expectations, and there the picture is weak. The market expected $26.94M, and the actual figure came in 63% lower. The company's release gives no explanation for the gap. Management's framing is that 2026 was a foundation year and revenue will scale in 2027. Billing starts when a customer accepts a cluster, and the large acceptances fall in December and January. This quarter's revenue includes the first large cluster of about 1,000 NVIDIA B300s. That cluster was delivered to and accepted by a global technology company. Nine-month revenue was $12.16M, compared with $1.21M a year earlier.
The contract book runs far ahead of revenue.
Total contract value rose to $9.6B, spread over an average of 5.5 years. Of that, $2.5B was signed since the second quarter. New contracts include a $1.32B five-year take-or-pay deal with a global AI lab. Two more deals of $1.0B and $170M were added in the fourth quarter to date. The company says the majority of this value comes from customers with investment-grade credit ratings. Long-term pricing also rose: annualized revenue per megawatt went from $15M to more than $19M. Contract value is not revenue. The company states this clearly in the release. According to the earnings call, the company terminated one customer contract over credit concerns. It re-let the freed capacity at a higher price.
The loss widened, but the cash cushion is thick.
Net loss was $43.8M, compared with $1.6M in the year-ago quarter. Adjusted EBITDA was negative $25.8M. General and administrative expenses alone reached $26.3M. Gross profit was $9.11M, and gross margin excluding depreciation was 91.8%. Operations consumed $66.1M of cash in the quarter, and equipment advances reached $293M. On the other hand, cash stood at $1.34B at the end of September, up from $71M in December 2025. Since December 2025 the company has raised about $2.6B of debt and equity. The balance sheet carries $1.01B of convertible notes. CFO Anuj Goel said the company is not reliant on the unsecured debt market. New debt will be secured against signed contracts and GPUs. For help reading cash flow, see the cash flow guide.
The January 2027 target is the real test.
The company gives no quarterly revenue guidance; it gives an annual revenue run-rate target instead. ARR, at $50M in September, is expected to reach $400-450M in January 2027. That is 8-9 times the current level. The target rests on about 30 megawatts of the 129 megawatts under contract. That capacity is installed and in final testing. Power is connected for clusters of 8,000 B300s and 4,000 GB300s. The remaining steps are commissioning and NVIDIA verification. Total capacity is planned to reach 212 megawatts in 2027, with 155 megawatts available for sale. The company expects more than $30M of annualized revenue per megawatt on short-term NVIDIA program contracts. It also obtained SOC 2 Type 2 attestation this quarter. For how to read an earnings day, see the guide.
Next quarter, watch a single number.
The number to watch in the fourth-quarter report is ARR. If it is reported above $400M as of January, the contract book has started turning into revenue. In that case this quarter's revenue gap stays a timing issue. If ARR stays below $400M, the problem is not the calendar but delivery capacity. The $9.6B of contract value should then be read more cautiously. The second measure is cash: how much of the $1.34B goes into equipment. The analysts' average target of $104.50 was set in the months before the report. Whether those targets are revised after the results also matters. The stock traded between $1.90 and $139 over the past 52 weeks. With that volatility, a one-quarter move should not be treated as a lasting verdict. The company listed in February 2026, so a one-year return cannot be calculated yet.
Looking Ahead
Strengths and Risks
5 Strengths · 6 RisksStrengths
5- Total contract value rose to $9.6B, with $2.5B signed since the second quarter.
- Long-term contract pricing rose from $15M to more than $19M of annualized revenue per megawatt during 2026.
- Cash stood at $1.34B at the end of September, alongside about $0.8B of customer deposits.
- Gross margin excluding depreciation was 91.8%, and management targets project contribution margins above 80% at full deployment.
- The company signed its first GPU-backed loan, a $356M facility led by Goldman Sachs.
Risks
6- Revenue of $9.93M was 63% below the consensus estimate, and the conversion of contracts into billing could slip.
- Net loss rose to $43.8M and adjusted EBITDA was negative $25.8M.
- Operations consumed $66.1M of cash in the quarter and equipment advances reached $293M.
- The balance sheet carries $1.01B of convertible notes, which produced a $400.4M fair value loss in the second quarter.
- Contracts rest on a small number of large customers, and the company lists customer concentration as a risk.
- The stock's beta is above 6 and its 52-week range is $1.90 to $139, so volatility is very high.
What to Watch
4- December 2026-January 2027Commissioning, testing and NVIDIA verification of the B300 and GB300 clusters.
- January 2027About 30 megawatts of contracted capacity is expected to start billing, lifting ARR to $400-450M.
- Through 2027, total capacity is planned to reach 212 megawatts, with 155 megawatts available for sale.
- Q4 and full-year 2026 results; the company reported 2025 results on March 31.
Upcoming Earnings
To Understand This